top of page

University Square

We worked with 2Construct Melbourne to screen 250 cubic meters of soil at University Square Melbourne which was contaminated with concrete building rubble and tree roots. This material wouldn’t have been accepted to clean fill disposal.

We used our 25mm screen to clean the soil and it was then able to be reused on site. All oversized material was disposed.

This process reduced disposal, transport and soil purchase costs at the project and only required one day of screening.

Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Instagram Social Icon
  • LinkedIn Social Icon
bottom of page